Email alerts

Online Polling

ID Renewal

ID Renewal Requirements

  •     The classified companies and contractors prior to the Regulation Number (1) of (2007) must meet the following requirements:

  •     Support letter from the ministry of trade/general directorate of company registration.

  •     Present evidence of financial ability appropriate to the applicable grade.

  •     Relevant Syndicates’ support letters for engineers, accountants and legal advisors; appropriate for the applicable grade.

  •     Support letter from the Lawyers’ Syndicate.

  •     Returning the expired classification ID. If lost, must take all the necessary procedures and publish an advert in a local newspaper.

  •     Presenting implemented works directly by the company in the last three year.

  •     The classified companies and contractors in accordance with Regulation Number (1) of (2007) must meet the following requirements

  •     Companies

  •     Evidence of re-registration of the company’s branch in the ministry of trade/general directorate of company registration.

  •     Preparing engineering, accounting and legal advisory units appropriate to the grade and in accordance with Regulation Number (1) of (2007).

  •     Returning the expired classification ID. If lost, must take all the necessary procedures and publish an advert in a local newspaper.

  •     Presenting documentation on the implemented work after August 2007, including (work contract project finalization memo) otherwise legitimate justification must be presented.
     

  •     Contractor (natural person)

  •     Support letter from the Contractors Union or presenting the Union membership ID.

  •     Preparing engineering, accounting and legal advisory units appropriate to the grade and in accordance with Regulation Number (1) of (2007).

  •     Returning the expired classification ID. If lost, must take all the necessary procedures and publish an advert in a local newspaper.

  •     Presenting documentation on the implemented work after August 2007, including (work contract project finalization memo) otherwise legitimate justification must be presented.

About MOP | Strategic Planning | Gov. Investments Budget | Int’l Cooperation | Regional Statistics | HR Development | The contractors classification | Public Contracting Directorate
Home | Site Map | FAQ | Newsletters | Contact Us | Login
Copyright © 2012 Ministry of Planning / Kurdistan Region.
Powered by Synergy Portal Technology.